NTS AI infrastructure racks with GPU servers staged in Fremont
AI infrastructure guide

Compute, fabric, storage, and ops for AI programs

Enterprise reference for AI compute, network, storage, and operations—from workload sizing to rack-ready deployment on Elite APEX platforms.

AI infrastructure

Align workload, facility, and vehicle before the RFQ

Production AI stacks span four layers NTS validates before quote release: compute (GPU density, cooling), network (InfiniBand, RoCE, or Ethernet), storage (NVMe checkpoints, parallel FS), and operations (BMC, burn-in, CLIN mapping).

Platform selection starts with workload class—training/fine-tuning, inference at scale, HPC adjacency, or edge/ROBO—not silicon marketing names alone.

NTS integrates NVIDIA HGX (H100/H200/B200/B300) and AMD Instinct on U.S.-staged chassis in Fremont, with dual-vendor BOMs when programs need supply diversity.

Architecture paths

Layers, platforms, and procurement

Move from architecture layers into GPU SKUs, sizing, cooling, fabric, and contract vehicles.

Elite APEX GPU platforms Compute Elite APEX GPU platforms 2U–4U PCIe and 8U HGX systems for departmental training through large-model scale-out.
  • HGX B200 / B300
  • Instinct options
  • Air or DLC
Explore Elite APEX GPU platforms →
GPU sizing guide Sizing GPU sizing guide Memory class, form factor, and RFQ inputs for training, fine-tuning, and inference.
  • HBM guidance
  • 2U / 4U / HGX
  • RFQ checklist
Explore GPU sizing guide →
Fabric & scale-out Network Fabric & scale-out East-west GPU traffic, 400G/800G NICs, and management plane separation for training rows.
  • IB / RoCE
  • Rail-optimized options
  • QoS for mixed pools
Explore Fabric & scale-out →
Checkpoint & dataset tiers Storage Checkpoint & dataset tiers NVMe checkpoint tiers, parallel filesystems, and dataset landing zones sized to ingest rate.
  • NVMe scratch
  • Parallel FS / object
  • Growth horizon
Explore Checkpoint & dataset tiers →
Power & cooling Facility Power & cooling Air vs DLC when rack kW exceeds air envelopes—CDU worksheets in architecture review.
  • kW/rack gates
  • DLC / CDU
  • Elevation packages
Explore Power & cooling →
Staging & burn-in Operations Staging & burn-in Fremont soak, firmware baselines, serial manifests, and nationwide rack-stack.
  • 48h burn-in patterns
  • Imaging baselines
  • L11 / L12
Explore Staging & burn-in →
SEWP V · ITES-4H · SLED Procurement SEWP V · ITES-4H · SLED Product CLINs on federal GWACs and cooperatives; integration on the same vehicle when possible.
  • SEWP V
  • ITES-4H
  • OMNIA / DIR / TIPS
Explore SEWP V · ITES-4H · SLED →
Submit a GPU BOM review Next step Submit a GPU BOM review Share workload profiles, facility limits, and vehicle—receive fabric, cooling, and BOM guidance.
  • CLIN-aligned quote
  • Fabric sketch
  • Cooling posture
Explore Submit a GPU BOM review →

Frequently asked questions

We review GPU count and SKU, host CPU/memory, fabric topology, storage throughput, rack kW, cooling mode, and contract vehicle scope—then return a CLIN-aligned quote.

  • Four-layer check
  • Facility gates called out
  • Attachments for CORs

Yes, with scheduler partitioning and storage tiering. NTS architects node pools and network QoS so inference latency is not starved by training jobs.

  • Partitioned pools
  • Storage tiering
  • QoS on east-west

Share model scale, framework, node count target, facility power, and vehicle (SEWP V, ITES-4H, etc.). Pair this guide with the GPU sizing guide and FAQ hub.

  • Workload + facility
  • Vehicle selection
  • Sizing companion

2U–4U GPU servers for departmental training and inference; 8U HGX for large-model training; liquid-cooled paths when air cannot hold rack kW; dual-vendor NVIDIA/AMD BOMs when required.

  • Form factor by density
  • DLC when needed
  • Supply diversity options