Direct liquid-cooled GPU server with cold plates and manifolds
NTS Liquid Cooling Built in the USA

Direct Liquid Cooling for Dense AI Racks

Cold plates, manifolds, QDs, and CDU programs sized to HGX and high-TDP nodes—facility worksheets and Fremont soak before freight.
Liquid Cooling

DLC programs with CDU and rack accountability

NTS liquid cooling covers CPU/GPU/DIMM cold plates, horizontal CDMs, 100 kW and 250 kW class CDUs, and hose kits—coordinated with Supermicro, CoolIT, Motivair, and HPE ecosystems when programs require them.
Choose DLC when air cannot hold clocks on dense HGX or high-kW racks without excessive fan power. Hybrid air/liquid rows are supported when elevations and coolant domains are documented.
Procurement spans SEWP V, ITES-4H, and SLED vehicles; thermal soak and leak/flow evidence ship with Fremont integration when L11/L12 is on the same vehicle.
NTS documents rack elevation, PDU draw, thermal headroom, and driver baselines on every RFQ so facility teams are not discovering constraints at install.
Related storage, networking, and software lines can ride the same quote when your vehicle and SOW allow—keeping multi-vendor programs under one accountable integrator.
Cooling paths

DLC racks, CDUs, and related platforms

Continue into liquid-cooling racks, GPU DLC SKUs, B200 design guidance, and Fremont staging.
NTS catalog

Available Liquid Cooling configurations

Select a platform below to configure, request a quote, or add to your procurement package.

Engineer-to-order — final BOM validated by NTS architects for workload, facility power, and contract vehicle.

  • Configure & quote
  • CPU / memory / storage specs
  • Contract-ready procurement
Specifications shown are reference configurations—final BOM validated by NTS architects for your workload, facility power, and security baseline.

Frequently asked questions

High-TDP GPU nodes, dense racks, and 24/7 training where air cannot hold clocks without excessive fan power.

  • Facility CDU required
  • Weight and leak response plans

Yes with clear rack elevation and coolant distribution design—NTS documents both thermal domains.

  • Do not mix casually
  • Worksheets provided

Yes—attachments include coolant flow, power, and acceptance criteria contracting officers expect.

  • Longer lead times possible
  • Milestones at quote

FRU procedures include coolant safety steps; NTS trains to the SOW and provides serial-tracked parts.

  • Support playbooks
  • On-site options